1 Year Tax Savings: $18,078 (Federal Only)
| Study Highlights | |
| Wages | $525,358 |
| Supplies | $26,953 |
| Rental or lease of computers | 27.5-Year |
| Contract Research | $11,760 |
| Total Qualified Research Expenditures | $537,118 |
| Study Highlights | |
| Wages | $525,358 |
| Supplies | $26,953 |
| Rental or lease of computers | 27.5-Year |
| Contract Research | $11,760 |
| Total Qualified Research Expenditures | $537,118 |

Overview A full-service electrical contractor specializing in commercial and heavy industrial construction engaged Engineered Tax Services to evaluate and document its research and development (R&D) activities across multiple tax years. Despite operating in a traditional industry, the company was actively developing custom electrical engineering solutions, optimizing system performance, and solving complex project-specific challenges—making them a strong candidate for the R&D

Property Overview Property Type: Warehouse / Manufacturing Location: Corona, CA Year Acquired: 2025 Year Built: 1991 Building Size: 223,055 sq ft Total Depreciable Basis: $37,471,308.62 Placed in Service: October 15, 2025 This engineering-based cost segregation study was performed on a large warehouse and manufacturing facility in Corona, California. ETS analyzed the building and site improvements to identify assets eligible for

Property Overview Property Type: Pre-School Facility Location: Wesley Chapel, FL Year Acquired: 2023 Year Built: 2006 Building Size: 10,091 sq ft Total Depreciable Basis: $3,020,340.93 Placed in Service: September 15, 2023 Pre-School Study on a $3,020,34… Key Results Asset Reclassification Asset Class Allocation % of Property 5-Year Property $497,915 16.49% 15-Year Property $680,522 22.53% 39-Year Property $1,841,904 60.98% Total accelerated

Project Overview Engineered Tax Services conducted a detailed engineering-based cost segregation study on a pre-school facility in Cape Coral, Florida with a total depreciable basis of $1,215,785. The study analyzed construction components, building systems, and site improvements to identify assets eligible for accelerated depreciation. Through an in-depth engineering analysis and site inspection, ETS reclassified portions of the property into shorter
Get all the latest news & updates on Tax Credits and Incentives delivered straight to your inbox.
Find services, resources, case studies, and more
Esc to close